• Flex Scada
    • What is FlexSCADA
    • Flexs Q5 Remote Site Telemetry and Control
    • Flexs Q5 Pro
    • Flex Q5 / Q5 Pro User’s Guide
    • Resources
    • Flexscada Technical Bulletins
    • FlexSCADA Manuals & Downloads
    • FlexSCADA White Papers, Articles & Videos
  • Superwind
    • Superwind 350 Turbine
    • Superwind 1250 Turbine
    • MCE-ARS Remote Control Wind Turbine Switch
    • Optional Superwind Products & Services
    • Saltwater & Marine Solar Systems
    • Resources
    • Superwind Technical Bulletins
    • Superwind Manuals & Downloads
    • Superwind White Papers, Articles & Videos
    • Spanish Version
  • Global Projects
    • Industry Overview
    • Client Photos
    • News
  • About Us
  • Contact
  • Press Releases

Mission Critical Energy, Inc.

Mission Critical Energy, Inc.

  • Flex Scada
    • What is FlexSCADA
    • Flexs Q5 Remote Site Telemetry and Control
    • Flexs Q5 Pro
    • Flex Q5 / Q5 Pro User’s Guide
    • Resources
    • Flexscada Technical Bulletins
    • FlexSCADA Manuals & Downloads
    • FlexSCADA White Papers, Articles & Videos
  • Superwind
    • Superwind 350 Turbine
    • Superwind 1250 Turbine
    • MCE-ARS Remote Control Wind Turbine Switch
    • Optional Superwind Products & Services
    • Saltwater & Marine Solar Systems
    • Resources
    • Superwind Technical Bulletins
    • Superwind Manuals & Downloads
    • Superwind White Papers, Articles & Videos
    • Spanish Version
  • Global Projects
    • Industry Overview
    • Client Photos
    • News
  • About Us
  • Contact
  • Press Releases

Superwind Technical Bulletins

Superwind Technical Bulletinsadmin2021-10-21T00:48:58+00:00

 

SB 0001-18-184 – SW (12&24V Potted SW350 SCR Charge Controller issue when a remote sensor is installed

SB 0003-18-238 – SW (SW350/353 Bridge Rectifier Tests)

SB 0004-18-256 – SW (SW350/353 Extreme Conditions Yaw Mount Stainless Steel Bushing Installation)

SB 0005-18-239 – SW (Testing and operation of the Superwind STOP Switch)

SB 0006-18-301 – SW (SW35X-ARS remote switch installation)

SB-0008-18-315-SW (Use of Locktite® 243 during assembly of SW350/353 turbines)

SB-0010-19-214-SW (SCR12 and SCR24 Charge Controller Test Points)

SB-0011-19-217-SW (Superwind 350 Main Bearing Replacement)

SB-0012-19-200-SW (Superwind Turbine Wind Speed Survival Ratings)

SB 0015-19-233 – SW (Charging Lithium Ion batteries with the SW35X turbine series)

SB-0016-19-246-SW (Superwind Turbine Operation During High Winds)

SB-0021-19-274-SW (amp coil vs calibrated shunt)

SB-0030-20-105-SW (Digital DC clamp meter use to verify Superwind turbine output)

SB-0030-20-148-FS (flexSCADA Morningstar use)

SB-0034-20-167-SW (MCE-ARS Stop Switch)

SB-0035-20-216-SW (MCE-ARS power distribution board)

 

 

 

 

Home Page 

Superwind Turbine Manuals & Technical Bulletins

Superwind Related Videos

Superwind Warranty

MCE Return Policy

Client Photos & Integration Gallery

Sunware.DE

 

© 2025 Mission Critical Energy, Inc. All Rights Reserved.